Skip to main content

Eikenhof Bridge

[featured_image]
Download
Download is available until [expire_date]
  • Version
  • Download 26
  • File Size 12.00 KB
  • File Count 1
  • Create Date 25th October 2024
  • Last Updated 30th October 2024

Eikenhof Bridge

Project Title: The Proposed Construction of a Bridge over the Palmiet River at Eikenhof Fruit Farms, Elgin

Consultant: Marais Geldenhuys (marais@dougjeff.co.za)

DEA&DP Reference Number: 16/3/3/6/7/1/E4/8/1469/24.

Comment Period: 30 October 2024 until 28 November 2024

Click the "Download Complete Report" button to download the full report with all the appendices. Alternatively use the links below to download the individual documents.

Eikenhof Bridge BAR