Skip to main content

Hottentots Holland Nature Reserve & Groenlandberg Nature Reserve

[featured_image]
  • Version
  • Download 96
  • File Size 16.00 KB
  • File Count 1
  • Create Date 6th February 2026
  • Last Updated 22nd July 2026

Hottentots Holland Nature Reserve & Groenlandberg Nature Reserve

Project Title: Maintenance Management Plan (MMP) for the Proposed Repair and Maintenance of Roads in the Hottentots Holland- and Groenlandberg Nature Reserves, Theewaterskloof Municipality, Overberg District, Western Cape

Consultant: Adél Groenewald

Contact Person: Carlè Heyns (carle@dougjeff.co.za)

DFFE Reference Number: 2025-10-0011

DJEC Reference: 2025/44

Comment Period: Thursday, 23 July 2026 to Tuesday, 25 August 2026

Click the "Download Complete Report" button to access the full report with all the appendices as outlined below.

Draft Maintenance Management Plan (MMP) Report 

  • Appendix 1: Locality Map
  • Appendix 2: DFFE Pre-Application Meeting Information
    • Appendix 2.1: Pre-Application Meeting Request Form
    • Appendix 2.2: Pre-Application Meeting Minutes
  • Appendix 3: Screening Tool Report 
  • Appendix 4: Site Sensitivity Verification Report (SSVR) 
  • Appendix 5: Design Specifications and Standards 
    • Appendix 5.1: Engineering Designs
    • Appendix 5.2: WCG Side Drain Design Specifications
    • Appendix 5.3: WCG Subsoil Drainage Design Specifications
    • Appendix 5.4: WCG Culvert Design Specifications
    • Appendix 5.5: WCG Gabion Design Specifications
  • Appendix 6: Engineering Conditional Roads Assessment 
  • Appendix 7: Method Statements
    • Appendix 7.1: Method Statements: Drainage Structures
    • Appendix 7.2: Method Statements: Road Surface
    • Appendix 7.3: Method Statements: Erosion Control
    • Appendix 7.4: Method Statements: Vegetation Control
    • Appendix 7.5: Method Statements: General Maintenance
  • Appendix 8: Locations of Road Infrastructure & Maintenance Activities
  • Appendix 9: Environmental Sensitivity Maps
  • Appendix 10: Public Participation Process (PPP) Information
    • Appendix 10.1: Notification Letter
    • Appendix 10.2: Site Notices (English & Afrikaans)
    • Appendix 10.3: Advertisements published (English & Afrikaans)
    • Appendix 10.4: PPP Register (not included due to POPIA restrictions)
  • Appendix 11: Proof of PPP (Previous Application)
    • Appendix 11.1: Proof of Notification Letters Sent
    • Appendix 11.2: Proof of Delivery
    • Appendix 11.3: Proof of Site Notices Placement
    • Appendix 11.4: Proof of Advertisements Placed
    • Appendix 11.5: Comments Received during PPP
    • Appendix 11.6: Comments and Responses Report
    • Appendix 11.7: PPP Register (not included due to POPIA restrictions)
  • Appendix 12: Aquatic Ecosystem Impact Assessment
  • Appendix 13: Proof of Pre-application GA Enquiry to BOCMA
  • Appendix 14: Boland Mountain Complex Protected Area Management Plan (PAMP)
  • Appendix 15: Section 30A Directive
  • Appendix 16: DFFE Document Control Form 
  • Appendix 17: CVs of EAPs 
  • Appendix 18: Declaration of Applicant (not included due to POPIA restrictions)
  • Appendix 19: Landowner Consent Form (not included due to POPIA restrictions)
  • Appendix 20: Declaration of Specialist (not included due to POPIA restrictions)